Street Department
David Faulkner, Street Department Supervisor
Phone: (928) 432-4197
The Street Division performs maintenance for approximately 41 miles of streets, 80 miles of parkways, 30 miles of sidewalks, 20 miles of alleyways and 20 miles of drainage systems.
The Division consists of ten employees that complete the maintenance activities listed below:
Patching, Sealing, Renewal, Repair and Overlay of Existing Roadway Surfaces Drainage Systems Alleyway and Parkway Maintenance, including Weed Control Traffic Control Devices, Street Sign Maintenance, Striping Street Sweeping Debris Removal from Roadways Sidewalk Maintenance Maintenance performed within City Limits.
Please contact ADOT at 928-432-4900 for any issues on Route 70 or US Hwy 191 including traffic signals.
