Bid Results
Printer-friendly version
| Filename/Title | Size |
|---|---|
| Control Building 69kV City Switch Station Bid Results.pdf | 62.3 KB |
| Commodity Materials.pdf | 241.66 KB |
| Hillcrest Airport Rd Transmission-Phase 1.pdf | 85.73 KB |
| Relay Control Panels.pdf | 83.97 KB |
| Substation Steel Manuf. Svc.pdf | 68.06 KB |
| Control Building.pdf | 56.18 KB |
| Manhole Insecticide Treatment.pdf | 66.65 KB |
| 8th Ave 69kV Substation Expansion and New 69 kVCity Switch Station.pdf | 81.65 KB |
| 12kV Substation Equipment-8th Ave Substation.pdf | 416.51 KB |
| Downtown Intersection Improvements.pdf | 147.29 KB |
| 20th Ave Sidewalk Improvements.pdf | 92.09 KB |
| Electric Renewal of Overhead Conductor, Poles and Equipment Phase II.pdf | 74.82 KB |
| Hillcrest_Airport Road Transmission Main Phase 1.pdf | 110.55 KB |
| Runway 12-30 Rehabilitation.pdf | 94.67 KB |
| 8th Ave US 70_2nd Ave Sewer Rehab.pdf | 74.94 KB |
| Sewer Manhole Rehabilitation.pdf | 88.6 KB |
| Ten Million Gallon Reservoir Renovation.pdf | 105.7 KB |