- Home
- Departments
- Public Works
- Street Maintenance
Street Division
City of Safford Street Division
Maintenance
The Street Division performs maintenance for approximately 41 miles of streets, 80 miles of parkways, 30 miles of sidewalks, 20 miles of alleyways and 20 miles of drainage systems.
The Street Division is responsible for the following areas throughout the City:
|
|
A Right of Way Permit Application must be completed any time traffic will be impeded or the City's Right-of-Way is being encroached upon. Some examples included but are not limited to: roadway construction, utility work, driveways, landscaping, sign installation, sidewalks, and special events. Once the Right-of-Way Application is completed, please fax (928) 428-7914 or email the application Amber Hogle.
A Temporary Obstruction Permit Application must be completed any time City right of way will be temporarily obstructed by an object. Some examples include but are not limited to: moving storage containers, food trucks, sidewalk sales, etc.
Please contact ADOT at (928) 432-4900 for any issues on Route 70 or Hwy 191.